
When the Ford Centre opened a new branch in an existing building, we adapted the engineering systems to the new layout and operating profile.
The solution accounted for the available equipment, room loads, and future operation.
Single-point responsibility
Design, equipment selection, installation, and ongoing maintenance remain with one team.
